champ
If we can mine DSO at the main zone with overburden of
approx 25m the removal cost is inexpensive and faster to do
than the road/benefication plant for arruwurra which
can be done simultaneously while we mine the DSO.
For an ore area of say 1500m by 300m would require a
pit no larger than 1600m by 400 m.It costs approx. $1.50
per m3 to remove overburden so this is
1600 x 400 x 25 x 1.50 = $24m
Assuming 5m average ore depth then ore tonnage is
1500 x 300 x 5 x 2(density) = 4.5 mt (1.5 years worth)
or at $400/t =$1,800m revenue. Overburden removal cost is $5.33/t of shipped ore.
- Forums
- ASX - By Stock
- AEV
- sky news
sky news, page-24
-
- There are more pages in this discussion • 30 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEV (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $29.74M |
Open | High | Low | Value | Volume |
1.1¢ | 1.1¢ | 1.1¢ | $8.25K | 750.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 1486313 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 2153249 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 1486313 | 0.011 |
6 | 5634004 | 0.010 |
7 | 5859333 | 0.009 |
6 | 3404999 | 0.008 |
2 | 2400000 | 0.007 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 2153249 | 5 |
0.013 | 1760857 | 6 |
0.014 | 2425000 | 4 |
0.015 | 1623812 | 5 |
0.016 | 8119577 | 9 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
AEV (ASX) Chart |