Oxide Korbel essentially covers the two Resource Blocks plus some of the surrounding ground.
They won't have drilled RPM yet. The approach is to do desktop analysis and field work first. They will analyse this data and then work out locations for an IP Survey and future drilling. They would carry it out in a similar way though ... have drillers following behind IP survey crew to determine targeting.
I think most likely scenario is that RPM and other prospects will be drilled next year in parallel to infill drilling at Oxide Korbel.
There may be further drilling at Oxide Korbel after the Maiden JORC or they may wait until after the camp is established.
Incidentally - Alaska they can drill at any time of year. Just need to plan it to avoid avalanches paths. Summer and autumn is obviously optimal though.
- Forums
- ASX - By Stock
- NVA
- Estelle RPM Prospect - Resource Upside ...
Estelle RPM Prospect - Resource Upside ..., page-3
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVA (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.5¢ |
Change
0.003(1.64%) |
Mkt cap ! $37.75M |
Open | High | Low | Value | Volume |
15.3¢ | 15.5¢ | 15.0¢ | $15.88K | 102.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 45773 | 15.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.0¢ | 100000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 45773 | 0.150 |
3 | 108634 | 0.145 |
4 | 252000 | 0.140 |
3 | 67000 | 0.135 |
7 | 131468 | 0.130 |
Price($) | Vol. | No. |
---|---|---|
0.160 | 100000 | 1 |
0.165 | 22000 | 2 |
0.175 | 10000 | 1 |
0.180 | 27701 | 3 |
0.185 | 10555 | 2 |
Last trade - 16.10pm 30/08/2024 (20 minute delay) ? |
Featured News
NVA (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, MD & CEO
Anthony Noble
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online