TOE 5.45% 29.0¢ toro energy limited

toro deep yellow napperby uranium res.doubled

  1. 11,367 Posts.
    lightbulb Created with Sketch. 84
    Sydney - Friday - July 25: (RWE Australian Business News) - A
    new estimate based on 2007 drilling and assay results has doubled the
    JORC inferred resource estimate for the Napperby Uranium Project, 150km
    northwest of Alice Springs.
    Toro Energy Ltd (ASX:TOE) released the updated inferred resource
    of 4.6m tonnes at 305ppm (0.031pc) U3O8 for 1420 tonnes (3.13m pounds)
    of contained uranium oxide (using a 200ppm U3O8 cutoff), which is 112pc
    more than the last inferred estimate prepared 18 months ago by Deep
    Yellow Ltd (ASX:DYL).
    The new figure compares with DYL's December 2006 estimate of
    1.9m tonnes at 360ppm (0.036pc) U3O8 for 670 tonnes (1.48m pounds) of
    contained uranium oxide using the same cutoff.
    Toro holds an option to acquire 100pc of the project from DYL on
    certain commercial terms.
    The new resource estimate was calculated by SRK Consulting for
    inclusion into the Napperby Scoping Study.
    The mineralisation remains open along the strike of the
    palaeochannel.
    The modifications to the inferred resource estimate are due to
    assay results from samples from the completion in 2007 of 305 holes for
    about 3200m drilling.
 
watchlist Created with Sketch. Add TOE (ASX) to my watchlist
(20min delay)
Last
29.0¢
Change
0.015(5.45%)
Mkt cap ! $34.88M
Open High Low Value Volume
27.5¢ 29.0¢ 27.0¢ $66.10K 233.2K

Buyers (Bids)

No. Vol. Price($)
1 3396 28.5¢
 

Sellers (Offers)

Price($) Vol. No.
29.0¢ 8208 2
View Market Depth
Last trade - 16.10pm 13/11/2024 (20 minute delay) ?
TOE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.