MEU 2.63% 3.9¢ marmota limited

Heading North, page-2

  1. 836 Posts.
    lightbulb Created with Sketch. 369
    On the data available it is suggested that the only possible direction we can go is North . All the available data below supports strong demand for the trading week ahead . To support that I have jotted down all the positives from releases , past, present and future.
    Phase 2 Drilling fully funded commences in September. 1 metre samples being tested and results due soon. Elevated arsenic has been noted on the increase which is the pathway for gold . Continued High Grade drill results.On the data available it is suggested that the only possible direction we can go is North . All the available data below supports strong demand for the trading week ahead . To support that I have jotted down all the positives from releases , past, present and future.
    Phase 2 Drilling fully funded commences in September. 1 metre samples being tested and results due soon. Elevated arsenic has been noted on the increase which is the pathway for gold . Continued High Grade drill esults Phase 1. New extensions on NW flank 100m long. Reconnaissance success 450 North of mineralised zone. Significant gold strikes over 500m recorded . Over 200 drill holes greater than 1gt. All minerals close to surface . Fantastic Metallurgy recovery rates 94/97%. Gold price continues to climb. Tree sampling media all over world exposure for Marmota . Resource JORC estimate getting closer. Ways to bring AT into production mentioned frequently now. Leach gold tests due soon . Selling Junction Dam will provide working capital . New Tenement at Malbooma .
    Other high potential tenements with promise on hold at present due to AT. New position created Exec Director Production Shane Barker. Shares tightly held by top 20 shareholders owning 50% of the issued capital .
    Over this quarter there is bound to be some great releases of information to keep this company under the spotlight .
    Up anchor and lets head North.

 
watchlist Created with Sketch. Add MEU (ASX) to my watchlist
(20min delay)
Last
3.9¢
Change
0.001(2.63%)
Mkt cap ! $42.37M
Open High Low Value Volume
3.9¢ 3.9¢ 3.8¢ $12.15K 311.7K

Buyers (Bids)

No. Vol. Price($)
3 297780 3.8¢
 

Sellers (Offers)

Price($) Vol. No.
3.9¢ 565986 1
View Market Depth
Last trade - 16.10pm 01/11/2024 (20 minute delay) ?
MEU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.