FLC 1.12% 9.0¢ fluence corporation limited

Media update, page-2238

  1. 341 Posts.
    lightbulb Created with Sketch. 911
    Hi @ywtoh, you were asking about the MABR supplier for the upgrading works at Hespeler WTP, Ontario, Canada way back in Dec 2017. The tender has finally been publicised. Phase 1 scale is 9,320 m3/d and Phase 2 will be 13,980 m3/d.
    If Fluence bids then they will most likely be going head-to-head with GE and Oxymem (OxyMem's name only appeared on the portal this morning as I was putting the post together).
    https://hotcopper.com.au/data/attachments/1734/1734106-4bc0bde83947093d778d962014213785.jpg
    https://regionofwaterloo.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/18ea1e40-b738-4554-9714-7f4cabb1a0b4
    I've attached the bidding documents. Of interest is Section A-15 which codifies the bid evaluation criteria. I've attached the full document below as well as a section of evaluation criteria. Many insights into the bidding process and requirements.

    https://hotcopper.com.au/data/attachments/1734/1734109-eecc9351a96550f6ef48b1061c535829.jpg

    Pages 204 - 2010 also may also be of interest; they contain schematics of the proposed concept for MABR integration into the plant:

    https://hotcopper.com.au/data/attachments/1734/1734140-03c664d3a96035e56d149a0d8a45e01b.jpg

    Thanks @Xman1983 and @stockrock for posting the updated investor deck info.

 
watchlist Created with Sketch. Add FLC (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.