In early September 2019, we commenced drilling activities at the Malolos Oil Field that initially
include servicing the rig that is already on site at the Malolos-1 well and moving it by about 20
metres to the Nuevo Malolos-1 well for the deepening drilling. Results can be expected towards the
end of October 2019.
- Forums
- ASX - By Stock
- GGX
- Ann: Nuevo Malolos 1 Drilling Operations Commences
Ann: Nuevo Malolos 1 Drilling Operations Commences, page-16
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GGX (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.077M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
GGX (ASX) Chart |
Day chart unavailable