Given where we are with this project, I think we need to up the ante in our local (mining and processing) areas with a significant advertising / information blitz.
Info to go in the advert:
1. Number of jobs required in construction phase on all sites.
2. Type of jobs required on all sites.
3. Number of ongoing jobs post construction.
4. Life of the project.
5. Benefits to the Northern Territory overall
6. Where we are up to
7. What we are waiting on.
Tagline?? We have the projects, we have the passion
We need the people, we need the permits
Get people anticipating the project, talking about it and creating subtle pressure.
- Forums
- ASX - By Stock
- TVN
- Strategy Time
Strategy Time
-
-
- There are more pages in this discussion • 34 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.8¢ |
Change
-0.001(2.04%) |
Mkt cap ! $84.89M |
Open | High | Low | Value | Volume |
4.9¢ | 4.9¢ | 4.8¢ | $18.87K | 390.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 400511 | 4.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.1¢ | 100000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 400511 | 0.048 |
4 | 266000 | 0.047 |
5 | 517817 | 0.046 |
5 | 354722 | 0.045 |
3 | 1297295 | 0.044 |
Price($) | Vol. | No. |
---|---|---|
0.051 | 100000 | 1 |
0.052 | 12000 | 1 |
0.053 | 39001 | 2 |
0.055 | 121107 | 4 |
0.058 | 100000 | 1 |
Last trade - 14.28pm 04/11/2024 (20 minute delay) ? |
Featured News
TVN (ASX) Chart |