PLS 0.62% $2.43 pilbara minerals limited

Good News & Bad News, page-3478

  1. 1,458 Posts.
    lightbulb Created with Sketch. 126
    "Construction of the plant required an investment of $3,430 million. This included two 42” pipelines to transport the water to 3,200 m above sea level, four high-pressure pumping stations, a reservoir at the mine and high-voltage electricity infrastructure to operate the system.

    In order to ensure the electricity for pumping the water, BHP awarded a long-term contract for the development of the Kelar Power Plant, which was originally designed to use coal but was converted into a combined-cycle natural gas plant in order to have energy from a cleaner source."


    While the scarcity and margins for copper may make this feasible, the energy requirements are quite ridiculous.

    There are many other lithium reserves that do not impact the environment anywhere near as badly.
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
(20min delay)
Last
$2.43
Change
0.015(0.62%)
Mkt cap ! $7.317B
Open High Low Value Volume
$2.38 $2.48 $2.32 $34.36M 14.21M

Buyers (Bids)

No. Vol. Price($)
35 125016 $2.42
 

Sellers (Offers)

Price($) Vol. No.
$2.43 202624 93
View Market Depth
Last trade - 12.52pm 09/09/2024 (20 minute delay) ?
PLS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.