"Construction of the plant required an investment of $3,430 million. This included two 42” pipelines to transport the water to 3,200 m above sea level, four high-pressure pumping stations, a reservoir at the mine and high-voltage electricity infrastructure to operate the system.
In order to ensure the electricity for pumping the water, BHP awarded a long-term contract for the development of the Kelar Power Plant, which was originally designed to use coal but was converted into a combined-cycle natural gas plant in order to have energy from a cleaner source."
While the scarcity and margins for copper may make this feasible, the energy requirements are quite ridiculous.
There are many other lithium reserves that do not impact the environment anywhere near as badly.
- Forums
- ASX - By Stock
- PLS
- Good News & Bad News
Good News & Bad News, page-3478
-
- There are more pages in this discussion • 7,737 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PLS (ASX) to my watchlist
(20min delay)
|
|||||
Last
$2.43 |
Change
0.015(0.62%) |
Mkt cap ! $7.317B |
Open | High | Low | Value | Volume |
$2.38 | $2.48 | $2.32 | $34.36M | 14.21M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
35 | 125016 | $2.42 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.43 | 202624 | 93 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
41 | 185089 | 2.420 |
27 | 466033 | 2.410 |
36 | 375955 | 2.400 |
21 | 180623 | 2.390 |
16 | 172079 | 2.380 |
Price($) | Vol. | No. |
---|---|---|
2.430 | 135235 | 76 |
2.440 | 295745 | 42 |
2.450 | 386292 | 39 |
2.460 | 310547 | 28 |
2.470 | 449093 | 15 |
Last trade - 12.52pm 09/09/2024 (20 minute delay) ? |
Featured News
PLS (ASX) Chart |