scomo shamed into returning to burning Oz., page-279

  1. 36,918 Posts.
    lightbulb Created with Sketch. 4

    And while we wait for all these marvelous nuclear developments to occur rolleyes.png, the renewable revolution rolls on.

    " The Australian Energy Market Operator has predicted a 15-year timeframe to get a small modular reactor on-line in Australia, which would make it an option to replace the Bayswater and Tarong power stations over the next 20 years."

    Fortunately, we are not hanging around for the miracle.

    " Remote power system company Zenith energy has deployed a solar-diesel hybrid generation system at a remote Western Australia mine site, that the company believes will be one of the first such systems that shows the technology is commercially viable without the need for government subsidy. "

    https://reneweconomy.com.au/solar-powered-mines-now-commercially-viable-without-need-for-subsidies-83765/



 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.