Environmental Permits
This allows the EPA to begin immediate assessment without further studies being required, minimising the time required for the EPA to assess the Project.
Dave Reeves!
“In parallel with advancing the necessary permits over the next 12 months our other key focus areas for 2020 will be completing the Definitive Feasibility Study and advancing project finance discussions. By ticking these three boxes, we will be ready to commence construction in line with our anticipated timeframe of March Quarter, 2021”
All on target !
PC
- Forums
- ASX - By Stock
- CAI
- Ann: EPA Level of Assessment received for Warrawoona Gold Project
Ann: EPA Level of Assessment received for Warrawoona Gold Project, page-3
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAI (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable