Interesting. May be a smaller investment than expected in the road.
The path from Manono to the rail line at Kabondo Dianda via Mukwende is interesting. Particularly due to the details in the ACGT page here:
http://www.acgt.cd/006/59-projet-de...route-en-terre-kabondo-dianda-mukwende-350-km
Courtesy of our good friends at CREC 7
Only $6M project but Mukwende is only 66km from Manono
Kabondo - Dianda - Mukwende earth road rehabilitation project
Sino-Congolese program
November 19, 2018
Location
Haut-Lomami Province
Project costs
$ 6,000,000
Funding
Sino-Congolese program
Important dates
the project's objectives
Ensure traffic continuity and improve traffic conditions between Lubumbashi.
Reduce the operating cost of vehicles and their journey times.
Socio-economic context
This project is part of the rehabilitation and modernization of provincial roads, with a view to re-establishing the connection between the provincial capitals and the territories.
Business
SISC / CREC 7
Works implemented
Clearance and widening of the road right-of-way: 9 meters wide
Reloading the road body
Sanitation works (V-shaped gutters) at village crossings
Structures built
The Road to Manono, page-1016
-
- There are more pages in this discussion • 601 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online