I got 384m drilled with 347m above cut off ie S:R 0.1:1, which when using a 1.4SG equates to just over 3.4Mt @ a simply weighted average grade of 3.02%REE and 0.61% NdPr for a contained 103kt REE and 21kt NdPr.
Totally in line with previous results and increases the Pit life by approximately 2 years,
NB: This represents approximately 6% of the currently planed in-fill drilling program, and is outside of the origional PFS pit.
Add to My Watchlist
What is My Watchlist?