Ann: Vali-1 ST1 Drilling Progress Report, page-36

  1. 1,809 Posts.
    lightbulb Created with Sketch. 4681
    Hi boysy1,
    Great announcement;
    - especially the better-than expect outcome.
    - 9% porosity cut-off for defining net pay, so pay zones have porosity >9% which bodes well for rock quality and potential flow rates.
    - multiple other prospective zones.
    - MDT recovered gas demonstrating that the sands flow; another positive signal for reservoir quality.
    - I especially like comment (below) as there are numerous structural leads, potentially oil-bearing, in the shallower sections. L\Check out the sizeof the NARVI lead north of Kinta-1.
    "The Vali-1 location is mapped at the edge of, or just outside of structural closure for these reservoirs, indicating significant gas and oil potential as mapped up-dip of the Vali-1 location at these levels. There are also numerous Jurassic structures mapped within the permit which will now be high-graded due to the strong indications of oil migration into the Jurassic level evident in this well".


    https://hotcopper.com.au/data/attachments/1930/1930597-68477ff2b5110e3f6d8a4e5f5668d896.jpg

    Kind regards OldGeo.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $3.665M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $2.284K 1.142M

Buyers (Bids)

No. Vol. Price($)
10 19005694 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 11409690 13
View Market Depth
Last trade - 16.10pm 27/06/2025 (20 minute delay) ?
MEL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.