You've had my predictions in this thread that I thought were realistic but maybe conservative.
Due to another large shipment that left for the Korean Zinc Townsville smelter today, I've increased the probable numbers so as to make the stock numbers work and even then I have no stock left at the port now:
Zinc metal production 33,000t (that is the upper limit of their guidance)
Grade 50%
Concentrate produced 66kt
C1 costs 91c/lb
Combined figure for cash at bank($24mil), debtors($6mil), concentrate on hand($13mil) $43mil