On page 3 of the quarterly newsletter ELK make reference to the
'chemical flood option may provide the advantage of allowing a pilot study to be conducted; success in this activity would allow some of the Grieve Muddy reserves to be classified as 2P and move from their 3P classification.
Add to My Watchlist
What is My Watchlist?