Do you understand logic at all?
Cargos imply shipping
“eight cargos”
https://www.rigzone.com/news/new_fortress_energy_signs_lng_supply_deal-11-feb-2020-161047-article/
As FrankMe has pointed out, New Fortress Energy LLC has a war chest of $800m USD, they are not farting around with 0.5 mtpa.
https://www.hydrocarbons-technology.com/news/new-fortress-energy-secures-800m-loan-to-fund-natural-gas-projects/
The calculator is the calculator and you cannot get a cargo out of 0.5 mtpa, let alone “eight”!
PS. 8 cargos would be 2 trains per year