Courtesy of amnesic on the LSE chat site, of general interest on the rig move. This bit is probably relevant to spud date
Other large drilling rigs have traveled down the two-lane gravel highway. But they were hauled in pieces for later assembly, he said.
The Nordic-Calista Rig No. 3 was fully assembled and ready to be driven to the job site from Deadhorse. Deadhorse is the industrial hub for the Prudhoe Bay oil fields.
https://www.adn.com/business-econom...an-unusual-drive-down-alaskas-dalton-highway/
- Forums
- ASX - By Stock
- 88E
- Ann: Investor Presentation - Charlie-1
Ann: Investor Presentation - Charlie-1, page-70
-
-
- There are more pages in this discussion • 50 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 88E (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
-0.001(25.0%) |
Mkt cap ! $57.86M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $46.48K | 23.26M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
474 | 1305395133 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 23140122 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
475 | 1320295133 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 50475897 | 9 |
0.003 | 610885035 | 220 |
0.004 | 160217141 | 104 |
0.005 | 62508289 | 51 |
0.006 | 35001656 | 35 |
Last trade - 15.57pm 17/09/2024 (20 minute delay) ? |
Featured News
88E (ASX) Chart |