1MC 16.7% 0.3¢ morella corporation limited

Ann: New Financing Package, page-125

  1. 42 Posts.
    lightbulb Created with Sketch. 16
    DYOR but the real positive I see out of this is the potential for stage 2 to be completed. If no interest payments need to be paid then revenue can accumulate to cover the capital needed for stage 2. The loan is fixed but the cashflow to pay off the loan would be doubled with stage 2. If the virus cools off later in the year, China implements a stimulus, and European and rest of world growth of EV's continue then AJM now has the flexibility to take advantage of the uptick in Li consumption and / or pricing. That is a far better situation to get a favourable refinancing. They have 3 years to achieve this ramp up, which is arguably a realistic timeframe.
 
watchlist Created with Sketch. Add 1MC (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
-0.001(16.7%)
Mkt cap ! $15.44M
Open High Low Value Volume
0.3¢ 0.3¢ 0.3¢ $12.89K 4.596M

Buyers (Bids)

No. Vol. Price($)
145 197920249 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 44471257 94
View Market Depth
Last trade - 15.10pm 21/06/2024 (20 minute delay) ?
1MC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.