bungy,
i'm a little confused here mate.
can someone explain what the last part of this statement means:
"The difference between the 84.5 Mt high grade resource previously announced and the 64.5 Mt bedded high grade ore is 20 Mt of reworked Marra Mamba iron ore of a detrital nature."
where does hole UI314 fit into the picture.