Normaly the FPSO contractor gets nothing until the FPSO has at least flowed oil and maybe not til the performance test is complete. The performance test is normaly 100 hours at maximum design rates if they are acheivable.
Avi
- Forums
- ASX - By Stock
- NDO
- nido share and timing
nido share and timing, page-6
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NDO (ASX) to my watchlist
|
|||||
Last
86.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $196.1M |
Open | High | Low | Value | Volume |
88.0¢ | 88.0¢ | 86.0¢ | $29.96K | 34.69K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 15704 | 86.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
90.0¢ | 20000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 15704 | 0.860 |
1 | 55739 | 0.850 |
1 | 4000 | 0.810 |
1 | 62111 | 0.805 |
1 | 40500 | 0.800 |
Price($) | Vol. | No. |
---|---|---|
0.900 | 20000 | 1 |
0.970 | 19999 | 2 |
1.050 | 115000 | 2 |
1.090 | 50989 | 2 |
1.100 | 100000 | 1 |
Last trade - 15.59pm 24/07/2024 (20 minute delay) ? |
Featured News
NDO (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
Previous Video
Next Video
SPONSORED BY The Market Online