DXI 0.75% $2.70 dexus industria reit.

train leaving the station, page-29

  1. 8,358 Posts.
    lightbulb Created with Sketch. 211

    http://www.eurekaenergy.com.au/docs/2008/EKA20081023.pdf

    eureka annual report

    KOWALIK-1H

    The Kowalik-1H appraisal well was spudded on 18 July
    2008 with a surface location some 5 km’s north of the
    Kennedy-1H well and on trend from producing wells in the
    adjacent acreage. This well has been drilled vertically to
    approximately 12,000 feet as a pilot hole where it was
    logged, plugged back and sidetracked with the intention
    being to drill up to a 6,000 foot horizontal section within
    the upper horizon of the chalk. The pilot hole encountered a chalk section correlated to the Sugarloaf-1 well but some 40% thicker. This was anticipated as the seismic data indicates that the chalk thickens in the northern portion of the AMI. Whilst horizontal operations are not completed at the date of this Report, higher gas readings and flares have been observed whilst drilling which have been further elevated when activities are undertaken that reduce the bottom hole pressure in the well. This would suggest that the reservoir is acting in a favourable manner with hydrocarbon ingress into the well bore. We are encouraged by the indications received to date and are looking forward to well completion and production testing.

    40% thicker chalks..
 
watchlist Created with Sketch. Add DXI (ASX) to my watchlist
(20min delay)
Last
$2.70
Change
0.020(0.75%)
Mkt cap ! $856.6M
Open High Low Value Volume
$2.65 $2.71 $2.65 $1.070M 396.9K

Buyers (Bids)

No. Vol. Price($)
1 1137 $2.70
 

Sellers (Offers)

Price($) Vol. No.
$2.71 737 1
View Market Depth
Last trade - 16.10pm 18/11/2024 (20 minute delay) ?
DXI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.