There is abolutely NO mention of a pre-feasability study in this report what-so-eva.
Am I having a blonde moment or has the 'scoping study' tag just replaced the name for pre-feas?? Sounds like they're skipping a step.
Anyway if the DSO comes back with two thumbs up then that dashed timeline for starting in late 2009 will become a thick solid line.... i think.
If DSO comes back thumbs down then late 2010 could push back to mid 2011 as the only thing holding them up is impurities. If they have impurities then the benefication plant cost will blow out.
- Forums
- ASX - By Stock
- AEV
- quarterly out
quarterly out, page-3
-
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEV (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $21.14M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AEV (ASX) Chart |
Day chart unavailable
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online