Thought a seperate thread for news updates from integrator tiec.com.au.
Their latest:
Project update 1 – Nangeenan
So our new RBSS Power Cube is complete and waiting at our workshop ready for delivery to Nangeenan.
RBSS and TIEC have been busy preparing the site, with trenching well underway.
The custom ground mount array frame has been constructed ready for the PV panels to be attached. And as soon as those two tasks are completed we will ship up the Power Cube and connect it all up.
Check back soon to get more details for the RBSS Power Cube and the Nangeenan install.
System specifications:
- 2 x 10kWh Redflow ZBM2 batteries
- 10kVa Victron Quattro Inverter/Chargers
- 9kW ground mount PV array
© 2019 Tiec Services Pty Ltd trading as TIEC Electrical | ABN 40 090 393 963 • Lic EC 005815
Website by Axiom Design Partners
- Forums
- ASX - By Stock
- RFX
- TIEC UPDATES
TIEC UPDATES
-
- There are more pages in this discussion • 191 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RFX (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.63M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
RFX (ASX) Chart |
Day chart unavailable
The Watchlist
LGP
LITTLE GREEN PHARMA LTD
Paul Long, Chief Executive Officer
Paul Long
Chief Executive Officer
SPONSORED BY The Market Online