Hi KG
You've nailed it, spot on mate. Logs/pressure data, flow test, advanced seismics are all pieces that complete the puzzle or compliment a discovery.
However, thats not enough today. Most critical part to develop such project require lots of capital. How much money does a company have to take things fwd to development stage & beyond? That's where the big guns come in.
There's a lesson to b learnt from the operational blunder at H-2, wherein the open foot DST gave a <10MMcfd result.
I hope they get a substantial thickness of gas bearing sands (60m+) at Z1 & a decent flow rate to compliment the drilling.
Time will tell.
cheers
P.S: Hope u'r barracking for the lads at the Adelaide Oval mate. Enjpy.
Add to My Watchlist
What is My Watchlist?