SP8 0.00% 0.8¢ streamplay studio limited

i wonder, page-2

  1. 1,689 Posts.
    lightbulb Created with Sketch. 1
    You make it sound like JT is the only one who does things this way. He isn't. Most do. If you think there's a real problem, call ASIC, IMF and whoever else to get something done instead of just discourteously abusing the sensibilities of others.

    Shortly before PDN started it's meteoric rise in 2003, the company had to stop paying its directors etc. Reckon those who refused to give them credit kicked themselves later? Dunlop was taken on to do mine site design for the BFS in the main. That job is done, as has much of the geological analysis work. Given GIP's situation and how their preparatory work has progressed, the moves made are not unusual.
 
watchlist Created with Sketch. Add SP8 (ASX) to my watchlist
(20min delay)
Last
0.8¢
Change
0.000(0.00%)
Mkt cap ! $9.204M
Open High Low Value Volume
0.7¢ 0.8¢ 0.7¢ $2.914K 414.0K

Buyers (Bids)

No. Vol. Price($)
3 2192034 0.7¢
 

Sellers (Offers)

Price($) Vol. No.
0.8¢ 5850448 10
View Market Depth
Last trade - 15.58pm 16/08/2024 (20 minute delay) ?
SP8 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.