You could be onto something here ! I’m just thinking out aloud could HX build a commercial structure at the height of a conventional tilt up slab ? I think it would be possible as these are only 4 walls with a roller door access, they could actually park the HX inside the proposed commercial building and build from inside out as there is no obstacles and HX can simply drive out the roller door openings without any trouble once finished . Commercial single leaf build could be the go and a much quicker path to commercialisation imo .
- Forums
- ASX - By Stock
- FBR
- Ann: FBR Appoints Non-Executive Director - Greg Smith
Ann: FBR Appoints Non-Executive Director - Greg Smith, page-46
-
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $235.4M |
Open | High | Low | Value | Volume |
5.3¢ | 5.6¢ | 5.1¢ | $922.1K | 17.41M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 6423 | 5.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.3¢ | 613170 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 6423 | 0.052 |
1 | 18627 | 0.051 |
13 | 1528260 | 0.050 |
5 | 789512 | 0.049 |
6 | 621132 | 0.048 |
Price($) | Vol. | No. |
---|---|---|
0.053 | 613170 | 2 |
0.054 | 915673 | 6 |
0.055 | 1619330 | 8 |
0.056 | 1283050 | 7 |
0.057 | 2038880 | 4 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |