... should start the minute Eric informs the market with no shouting giving me a headache, so I asked me ol mate Ya what could possibly be so hard your average tradie couldn’t sort inside a month so long as you didn’t mind them swanning off to Bunnings to get the right shaped widget for a couple of hours every day on your time and he kindly humoured me as follows and I was much obliged to him:
Hi CEO. Too technical a topic. Simple answer is it can b a tricky operation for a vertical/ lateral remediation workover. At U1 they had Baker for the ESP workover, not sure if they r doing it at U7 (or SLB r there). Showstoppers range from Mechanical issues with the tubing hanger, pump, electr cables, chemical injection, sliding sleeve etc. I dont know U7's profile so cant really comment (but thats what they had at U1).
Offshore rates r higher so they try to keep things fast with minimal downtime et al. Onshore can b a different pace.
U can read about ESP's from BH's website, see link.
https://www.bhge.com/upstream/produ...ersible-pumping-systems/pumps/flexpump-series
- Forums
- ASX - By Stock
- BRU
- the great small caps bru buy up...
the great small caps bru buy up...
-
- There are more pages in this discussion • 87 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BRU (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.8¢ |
Change
-0.002(2.50%) |
Mkt cap ! $52.36M |
Open | High | Low | Value | Volume |
8.0¢ | 8.0¢ | 7.8¢ | $1.992K | 25.29K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 7.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.0¢ | 42995 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 0.077 |
2 | 11000 | 0.076 |
4 | 165816 | 0.075 |
1 | 10000 | 0.074 |
1 | 10000 | 0.072 |
Price($) | Vol. | No. |
---|---|---|
0.080 | 42995 | 2 |
0.084 | 73555 | 1 |
0.085 | 7999 | 3 |
0.086 | 9898 | 1 |
0.087 | 163369 | 3 |
Last trade - 14.53pm 13/09/2024 (20 minute delay) ? |
Featured News
BRU (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online