I have mentioned previously the enormous stockpile of ore at P/H. Talk today was that, following BHP personnel visiting the site last week, BHP is going to take 15% of the stockpiled ore. That is 15% of 2.6 million tons as I understand it.
Add to My Watchlist
What is My Watchlist?