I was just watching the drone video at the beginning of the video and had an idea.
The unloaded palets on the ground being inserted into the HX by the telehandler seems very uneffective.
Why not load all the brick palets on a modified trailer at a factory, hang it to the HX and drive "fully loaded" to the construction site.
The trailer opens it front door, a conveyor belt connected to the rear part of the HX and the palet transport goes fully autonomous into the HX.
Just my thoughts on a new innovation for HX (Marc, if you read this, please name the trailer after me![]()
- Forums
- ASX - By Stock
- FBR
- First Commercial Build Update
First Commercial Build Update, page-19
-
-
- There are more pages in this discussion • 49 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
|
|||||
Last
2.4¢ |
Change
0.001(4.35%) |
Mkt cap ! $106.5M |
Open | High | Low | Value | Volume |
2.4¢ | 2.4¢ | 2.4¢ | $48.20K | 2.014M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
22 | 6283980 | 2.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.4¢ | 2977307 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
19 | 5921589 | 0.023 |
15 | 3109826 | 0.022 |
9 | 2977871 | 0.021 |
17 | 4235246 | 0.020 |
10 | 3993716 | 0.019 |
Price($) | Vol. | No. |
---|---|---|
0.024 | 2977307 | 3 |
0.025 | 4246718 | 17 |
0.026 | 2272759 | 14 |
0.027 | 2661680 | 7 |
0.028 | 3571888 | 5 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online