Had to watch twice but in real time it lays at same speed as a manual Brickie wtf however I’m impressed it works but really? Looking at space needed on site for stock (bricks) a manatau to load the Hadrian I’d say residential housing is out of the picture for this concept build. Then I would question the cost factor? 2 man being manatau driver loading machine and placing brick ties an the Hadrian operator seems to me a little light on as there would be a stop at lintel placement performed manually by the 2 machine operators! Ok doable ? But wtf good luck !! If this project takes more than 2 days for the walls scope of works tilt panel and modular would be much more cost effective and faster build! And done on any size project . Anyhow good luck I’ll watch this fairy tail evolve.
- Forums
- ASX - By Stock
- FBR
- First Commercial Build Update
First Commercial Build Update, page-29
-
- There are more pages in this discussion • 39 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
|
|||||
Last
5.1¢ |
Change
0.005(10.9%) |
Mkt cap ! $211.9M |
Open | High | Low | Value | Volume |
4.7¢ | 5.1¢ | 4.6¢ | $388.4K | 7.984M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 1922000 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.1¢ | 295507 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 1922000 | 0.050 |
3 | 2929659 | 0.049 |
1 | 104166 | 0.048 |
4 | 512148 | 0.047 |
5 | 316304 | 0.046 |
Price($) | Vol. | No. |
---|---|---|
0.051 | 295507 | 2 |
0.052 | 637269 | 6 |
0.053 | 335000 | 2 |
0.054 | 1260411 | 7 |
0.055 | 736916 | 7 |
Last trade - 16.10pm 30/07/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online