SVG 21.9% 2.5¢ savannah goldfields limited

Ann: Sherwood High Grade Zone larger than expected, page-148

  1. 184 Posts.
    lightbulb Created with Sketch. 33
    You would think it would be a 2 to 3 year process movin a plant to site waiting for permit approvals buildin tails storage somewere on site, drilling a borefield an water storage enough to keep up with a plant. Also they would have to get a hv power supply there or just run off diesel generators. Either way it would be a lenghty an costly process
    Last edited by Brady1: 10/09/20
 
watchlist Created with Sketch. Add SVG (ASX) to my watchlist
(20min delay)
Last
2.5¢
Change
-0.007(21.9%)
Mkt cap ! $7.027M
Open High Low Value Volume
2.6¢ 2.6¢ 2.5¢ $2.707K 107.4K

Buyers (Bids)

No. Vol. Price($)
1 23571 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.9¢ 19500 1
View Market Depth
Last trade - 15.38pm 26/07/2024 (20 minute delay) ?
SVG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.