Interested follower of Panoramic and their progress.Forgive me if a niave question but with the back reaming to take a further 4 months why would they not ream from the top at the same time as drilling is going on below and meet somewhere along the way?.Does that extra months back reaming hold up work back to production or can production recommence simultaneously?Cheers gltah
PAN Price at posting:
8.6¢ Sentiment: Buy Disclosure: Not Held