Abuman
Dont think they drill that fast once past the top hole.
If drilling did commence once SV was manned on Wed nite-Thu morn'n, so from 1886m to 3200m thats about 1400m.
You are talking 700m per day to see something as of now, nope, too optimistic an ROP to get there so soon IMO.
cheers
Add to My Watchlist
What is My Watchlist?