Thanks for the update, acturtle.
VPE lodged their drilling schedule today and show a minimum of five wells being drilled in ground jointly held with ITC and commencing in June 04. Thereafter a new well each month so continuous action.
Only weeks away now. Not deep drilling so results within two weeks of spud.
Good Luck all. This is the one.
Add to My Watchlist
What is My Watchlist?