AEV 0.00% 0.5¢ avenira limited

great announcement, page-35

  1. 1,200 Posts.
    lightbulb Created with Sketch. 5
    Assuming the metallurgy for the reported holes is favourable for DSO, and indications so far are positive, we have around 3.75 million tonnes of DSO in the holes 194-197 and 201-204.

    This is based on the estimate given in the recent quarterly; "By way of illustration, assuming a 3Mtpa output and an average 4m mineralisation
    thickness, the Company will need to mine the area tested by about two of its current
    500m x 500m spaced holes annually."

    We need the area represented by 4 of the 250x250m holes to equal that of the 500x500m, thus 8 to equal the 2 required at 2m thickness, or 16 x 1m. In the 8 holes (which average out to exactly 30% phosphate) we have the equivalent of 20 x 1m, giving the approximate 3.75 million tonnes.

    This is highly encouraging for the Arruwurra initial infill drilling results. I think that the comments made earlier on the thread that DSO is virtually a given are correct, and we have at least a years worth in that corner of Arruwurra alone.
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $11.74M
Open High Low Value Volume
0.6¢ 0.6¢ 0.5¢ $484 88.54K

Buyers (Bids)

No. Vol. Price($)
7 2947616 0.5¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 10091525 13
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.