GOR 2.05% $1.74 gold road resources limited

Ann: Gruyere Production Update, page-46

  1. 138 Posts.
    lightbulb Created with Sketch. 93

    AISC guidance is revised to go up $100 an ounce because of this quarter’s production disruptions.

    Production guidance anticipated at 250,000 to 270,000 ounces previously 250,000 to 285,000 ounces (JV). So potentially 15000 ounces less and cost $100 more per ounce.

    Probably more disturbing than the bearing failure.

    There is more to this story.

 
watchlist Created with Sketch. Add GOR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.