SO4 0.00% 31.0¢ salt lake potash limited

Ann: Annual Report to shareholders, page-4

  1. 989 Posts.
    lightbulb Created with Sketch. 99
    $170 000 000 over budget for an operation that is
    not going to be capable of producing name plate

    they need 800 hectares of pond surface to produce. 190 ktpa the remainder being imported MOP for 245 KTPA

    IMO it is a lack of brine hence the FT to the paleo channel
    or the EPA as rumoured has put a stop order on any lake development or as it suggest the local NT party has stopped on lake development

    the Fact is they are 400 ha of pond surface short and two years of evap to catch up after construction .
    construction begins after aproval ??

    there is only 300 mm of salt in the stage one pond which came from the whilliamson super pit
    there is another year of evaporation to get a floor and a harvestable depth
    This is the first time I have ever heard this being referred as stage one ??
    no wonder the offtake is not binding

 
watchlist Created with Sketch. Add SO4 (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.