VMS 5.26% 1.8¢ venture minerals limited

Ann: General Meeting 6 October 2020 - Update, page-53

  1. 3,009 Posts.
    lightbulb Created with Sketch. 206
    yeah maybe bad connection but zoom started here 12 noon as on time and meeting called done, cut off 12.15...heard the only 2 question regarding this meeting, from S Jordan being read out...no chat. First about whether the 10k tonnes was production or exploratory? second bout why equipment was floated off site.
 
watchlist Created with Sketch. Add VMS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.