CTO 11.1% 0.4¢ citigold corporation limited

Ann: Additional Reefs Planned in 2009 , page-66

  1. 2,739 Posts.
    lightbulb Created with Sketch. 2
    this is the way i see things.

    I'm guessing the price of gold will trade between AUD$1,000 -AUS$1200/oz in the foreseeable future.

    But the safe thing is to probably assume AUD$800/oz.

    So out of the current crop of leading 12 -13 producers - it only leaves low cost producers such as DOM , LGL and NCM any chance of seeing long term profits.
    NCM however has most of its resource in a very low grade mine (Telfer) and is producing profits from much smaller higher grade mines... so that leaves DOM and LGL which are fully priced as the 2 picks.
    DOM and LGL don't represent value .. they follow the gold price.

    OGC, SBM etc...look like are going to struggle... they are leading high cost producers that are losing money.

    CTO has demonstrated it could join the ranks of DOM and LGL.. one of its quarterlies the cash costs were AUD$371/oz..last quarter with only 2,500 oz produced the costs were AUD$480/oz .. still better than OGC and SBM producing at much higher rates.

    So there's light at the end of the CTO tunnel.

 
watchlist Created with Sketch. Add CTO (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
-0.001(11.1%)
Mkt cap ! $12M
Open High Low Value Volume
0.5¢ 0.5¢ 0.4¢ $2.794K 604.2K

Buyers (Bids)

No. Vol. Price($)
4 3078261 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 7556170 16
View Market Depth
Last trade - 13.07pm 09/09/2024 (20 minute delay) ?
CTO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.