Each Haliade-X offshore wind turbine uses about 7 tonnes of NdFeB magnets which include about 2 tonnes of Nd per turbine!
(They may have some Pr mixed in with the Nd - I haven't found that level of detail yet).
These Haliade-X are the turbines going into Dogger Bank and other large offshore wind farms.![]()
Add to My Watchlist
What is My Watchlist?