NML 0.00% 1.9¢ navarre minerals limited

Ann: First drill program starts at Jubilee Gold Project, Victoria, page-9

  1. 5 Posts.
    lightbulb Created with Sketch. 5
    I’m assuming as their Oct 5th announcement said: “12,000 metre regional air-core drilling campaign commences at Langi Logan, to be followed up with drilling at the Jubilee and St Arnaud projects.” That the first drilling at Langi Logan was completed prior to November 9 sometime (when the ASX announcement for starting Drilling at Jubilee was made). So would we expect some initial assay results from Langi Logan soon?
 
watchlist Created with Sketch. Add NML (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.