To better join the dots, its likely Powerlink and the Qld Govt wanted firm proof of life that our pipeline projects will proceed and the transmission line wouldn’t only be built for K2H.
While the immediate cash injection might be minimal, if at all, their technical input, access to capital, and risking assistance are invaluable in providing a realistic pathway to near-term financial close.
Regards
Jeremy
J-POWER sign MOU on GNX's K2 150MW Wind Farm for 50% equity, page-6
Add to My Watchlist
What is My Watchlist?