Hi Mulac1
I understand that they already looked at options to build or hire a mobile concentrator to produce concentrate. The front end of the plant is readily available for hire. It really depends on the size of the orebody and how quickly they wish to mine it. Companies like Mineral Resources specialise in BOO processing plants which could be a option going forward. No upfront Capital is require just an ongoing cost of per tonne for concentrate production.
I understand from my discussions at the last meeting that small mobile concentrator options are being considered as part of
the Scoping Study. The Canada test work will provide the flow sheet and critical equipment required to maximise the recoveries of all the contained metals in our concentrate which then are extracted during the smelting process. Personally I feel the BOO (A Contractor builds, owns and operates the plant) would be best option.
- Forums
- ASX - By Stock
- SGQ
- Ann: Results of Annual General Meeting
Ann: Results of Annual General Meeting, page-33
-
- There are more pages in this discussion • 52 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SGQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $27.21M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
SGQ (ASX) Chart |
Day chart unavailable