SGQ 0.00% 2.5¢ st george mining limited

Ann: Results of Annual General Meeting, page-33

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 443 Posts.
    lightbulb Created with Sketch. 313
    Hi Mulac1

    I understand that they already looked at options to build or hire a mobile concentrator to produce concentrate. The front end of the plant is readily available for hire. It really depends on the size of the orebody and how quickly they wish to mine it. Companies like Mineral Resources specialise in BOO processing plants which could be a option going forward. No upfront Capital is require just an ongoing cost of per tonne for concentrate production.

    I understand from my discussions at the last meeting that small mobile concentrator options are being considered as part of
    the Scoping Study. The Canada test work will provide the flow sheet and critical equipment required to maximise the recoveries of all the contained metals in our concentrate which then are extracted during the smelting process. Personally I feel the BOO (A Contractor builds, owns and operates the plant) would be best option.


 
watchlist Created with Sketch. Add SGQ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.