GBZ 10.0% 1.1¢ gbm resources limited

White Dam metallurgy and production, page-4

  1. 268 Posts.
    lightbulb Created with Sketch. 1011
    In their announcement on 5/10/20 "First Gold Dore Produced at White Dam", they state the following:

    "The SART Plant is meeting its design objectives of removing copper and increasing the recovery of the cyanide solution back into the circuit.."

    Additionally, they picture what appears to be >12 bulka bags of copper concentrate in that announcement (which was all the way back in October after only running for ~3 months). The way SART works is for every unit of copper dissolved with cyanide, it precipitates it back out as copper sulphide and releases the cyanide that was consumed when dissolving the copper. If you assume there is 500 kg of Cu2S in each of those bulka bags, then that is several tonnes of Cu2S already removed from White Dam's leach solutions, and thereby a fair amount of cyanide recovered. But we ultimately need to wait for an official figure on their copper produced in the next quarterly.

    If you are interested in the SART process, this is a good paper: https://sci-hub.se/https://doi.org/10.1016/j.hydromet.2018.01.011
 
watchlist Created with Sketch. Add GBZ (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
0.001(10.0%)
Mkt cap ! $12.72M
Open High Low Value Volume
1.1¢ 1.1¢ 1.1¢ $12.75K 1.159M

Buyers (Bids)

No. Vol. Price($)
2 1098986 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 442821 1
View Market Depth
Last trade - 12.13pm 11/07/2024 (20 minute delay) ?
GBZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.