There were several bit changes required in drilling the last 750m in the WE-2 well. There are several thick shale sections to drill through.
The Last update said they were at 4024m, and that leaves around 970m left to drill to TD.
If this well is similar to WE-2 there would be at least 3 days of tripping out and in to go IMO or possibly another 2 bit changes.
I doubt they will be testing the kingia level until late next week or even a bit after that.
It took 20 days from 4226m to 5000m in WE-2 mostly due to hard shales and low rate of penetration through those sections.
IMO
- Forums
- ASX - By Stock
- STX
- Ann: West Erregulla Update
Ann: West Erregulla Update, page-99
-
- There are more pages in this discussion • 45 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
18.5¢ |
Change
0.015(8.82%) |
Mkt cap ! $530.0M |
Open | High | Low | Value | Volume |
17.0¢ | 18.5¢ | 17.0¢ | $2.155M | 12.01M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 851855 | 18.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
18.5¢ | 131078 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
9 | 593855 | 0.180 |
13 | 898781 | 0.175 |
34 | 2111342 | 0.170 |
28 | 2089452 | 0.165 |
39 | 1603646 | 0.160 |
Price($) | Vol. | No. |
---|---|---|
0.185 | 76078 | 5 |
0.190 | 1277542 | 11 |
0.195 | 1127755 | 4 |
0.200 | 894999 | 13 |
0.205 | 685147 | 7 |
Last trade - 16.10pm 06/09/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |