re: Ann: Barrambie Vanadium DFS - Final Miner... Simon
When I refer to cost I am referring to manufactured price per kg. Ie: Is there sufficient margin between that cost and the current market price.
I raise the issue, because I know that Windamurra costs were always said to be "in the lowest quartile of producers". However that was never substantiated, and it is perhaps now an issue for them.
Then AXO's co-product will be free to the slag stage, so presummably the producer of that, will have a real cost advantage, and thus price advantage in the market.
These are my understandings, but I could be wrong.
- Forums
- ASX - By Stock
- NMT
- Ann: Barrambie Vanadium DFS - Final Mineral Resou
Ann: Barrambie Vanadium DFS - Final Mineral Resou, page-13
Featured News
Add NMT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.4¢ |
Change
0.003(3.30%) |
Mkt cap ! $72.32M |
Open | High | Low | Value | Volume |
9.4¢ | 9.4¢ | 9.1¢ | $66.79K | 714.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 107782 | 9.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.4¢ | 345453 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 107782 | 0.093 |
4 | 302192 | 0.091 |
2 | 4689 | 0.090 |
3 | 191478 | 0.089 |
3 | 249881 | 0.088 |
Price($) | Vol. | No. |
---|---|---|
0.094 | 345453 | 4 |
0.095 | 195277 | 1 |
0.096 | 210000 | 1 |
0.097 | 74057 | 3 |
0.099 | 453521 | 6 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
NMT (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online