The only thing I found confusing was that Scott mentioned there is a resource of 270kt nickel and we've now moved on to drilling the 25 massive sulphide veins out. The confusion is I thought the disseminated orebody was still open at depth and along strike and was being expanded with step out drilling since the maiden resource was published as 229kt + 50kt for 279kt. It might have been a slip up or perhaps I misunderstood him
- Forums
- ASX - By Stock
- BSX
- Ann: Blackstone Signs Trafigura to Supply Downstream Processing
Ann: Blackstone Signs Trafigura to Supply Downstream Processing, page-67
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BSX (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.4¢ |
Change
-0.001(2.86%) |
Mkt cap ! $17.94M |
Open | High | Low | Value | Volume |
3.5¢ | 3.5¢ | 3.4¢ | $2.533K | 74.05K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 50000 | 3.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.4¢ | 40151 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 15000 | 0.034 |
1 | 50000 | 0.033 |
1 | 16129 | 0.031 |
5 | 505000 | 0.030 |
1 | 5000 | 0.029 |
Price($) | Vol. | No. |
---|---|---|
0.033 | 24584 | 1 |
0.035 | 75408 | 2 |
0.036 | 100000 | 1 |
0.037 | 20000 | 1 |
0.038 | 62362 | 1 |
Last trade - 16.10pm 03/10/2024 (20 minute delay) ? |
Featured News
BSX (ASX) Chart |