E25 2.44% 21.0¢ element 25 limited

Ann: Binding Take or Pay Offtake Terms Finalised with OM Holdings, page-47

  1. 3,781 Posts.
    lightbulb Created with Sketch. 331
    This is absolutely correct.
    Additionally, they are building a rail spur and processing a 7% feed. We are on the highway and processing a 33%+ feed. We need significantly less (or smaller) leach tanks and pumps.
    The indirects look to be bribes or "permit fees". Very strange that they are so high.
    Powerplant would be owned by Alinta or other. Quite cheap these days to build solar, battery with gas backup.
 
watchlist Created with Sketch. Add E25 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.