TI1 0.00% 1.4¢ tombador iron limited

Ann: First Infill Drill Results, page-17

  1. 1,559 Posts.
    lightbulb Created with Sketch. 619
    Ned
    The numbers in the last chart are the thickness (m) of high grade IO
    Here are the hole numbers in the chart below...........
    It seems to thin out near the outside (the previous chart with the intersection thickness shows that), but encouraging they are doing another km of drilling. The announcement pretty much says that the lode is bigger than thought.....

    To define the final pit design, the Company has decided to extend the drill program
    due to continuing near surface hematite intersections south, west and east of the
    main lode.

    https://hotcopper.com.au/data/attachments/2935/2935018-7b909482c6da373ada9b7b4fbcdd2953.jpg
    Last edited by Torpy: 22/02/21
 
watchlist Created with Sketch. Add TI1 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.