    "Browns Range Pilot Plant OperationsDuring FY20, the Pilot Plant milled 19,314 tonnes of ore and produced 124,607 kg of rare earth carbonate. These operations allowed us to continue to test the pilot plant operation and collect valuable data to drive innovative solutions and improvement. A major shutdown was undertaken in the first quarterto enable modifications to the kiln feed system. These modifications addressed scale build up in the kiln, throughput rates and availability. These works were successful, with a notable increase in kiln performance when operations recommenced after the shutdown. On 22 November 2019 the Company officially opened the Training2Work facility as a part of a program that is being jointly undertaken with the Wunan Foundation. The Training2Work facility was established to enable members of the local indigenous community at Ringer Soak and Halls Creek to be trained in the skills that are required for positions in and around the mine site.In March 2020, a decision was made to temporarily suspend operations at the Browns Range Pilot Plant and move to care and maintenancedue to the Covid-19 restrictions. This suspension involved the temporary stand down of most site based staff (except for a small care and maintenance team), along with corporate office staff as well as the implementation of several cashflow saving measures.On 1 July2020, the Company made the decision to partially restart operations at the Browns Range Pilot Plant Project. This decision was made following the lifting of Commonwealth biosecurity restrictions applied to the Kimberley region as a part of Covid-19 control measures.The partial return of pilot plant operations at Browns Range resulted in about three quarters of the previous Project workforce being re-mobilised.Initial operations will focus on test workin the beneficiation circuit followed by tests in the hydrometallurgical circuitalong withmechanical construction and installation of the ore sorter"


    How much is DYL producing ? biggrin.png
 
watchlist Created with Sketch. Add NTU (ASX) to my watchlist
(20min delay)
Last
2.0¢
Change
0.000(0.00%)
Mkt cap ! $135.9M
Open High Low Value Volume
2.0¢ 2.1¢ 2.0¢ $141.0K 7.044M

Buyers (Bids)

No. Vol. Price($)
42 13879561 1.9¢
 

Sellers (Offers)

Price($) Vol. No.
2.0¢ 25000 1
View Market Depth
Last trade - 16.10pm 18/10/2024 (20 minute delay) ?
NTU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.